Select Page
Beira Interior
Portugal

The highway between Abrantes and Guarda covers a length of 177.8 km, with 28 intersections and 15.6 km of access roads. Globalvia is in charge of the project, construction, operation and financing of the Beira Interior highway under a Multi Lane Free Flow scheme (MLFF). We are also in charge of managing five service areas under concession agreements.

Cifras Relevantes
Inversión total:
932,880,000 euros
Capital social:
49

,

198,000 euros
Participación:
100%
Año de adjudicación:
1999
Duración de la concesión:
33 years
Longitud:
198 km
Intensidad Media Diaria 2023:
-
Empresa Concesionaria

SCUTVIAS, AUTOESTRADAS DA BEIRA INTERIOR, S.A.

CAM Centro de Assistência e Manutenção – EN 18 6005-193 Lardosa, Portugal

+351 272 440 440